• About Us
  • Data Centre Services
    • Comms Rooms
    • Data Centres
    • Edge Computing
    • Power & Cooling Upgrades
    • UPS Battery Replacement
  • Service & Maintenance
    • UPS Maintenance
    • Cooling Maintenance
    • Generator Maintenance
    • Fire Suppression Maintenance
  • Products
    • UNINTERRUPTIBLE POWER SUPPLIES
    • Small Single Phase UPS
    • Rack Mount UPS
    • Three Phase UPS
    • Modular UPS
    • Central Battery Systems
    • UPS Maintenance Bypass Switches
    • Backup Generators
    • Network & Server Racks
    • RACK POWER DISTRIBUTION (PDU)
    • Data Centre Cooling
    • Netbotz Environmental Monitoring
    • EcostruXure IT Software
    • FIRE SUPPRESSION SYSTEMS
  • Brands
    • APC
    • Riello
    • Eaton
    • Vertiv
    • SDMO
    • Uniflair
  • News
  • Contact Us
Menu

Source UPS

01252 692559

  • About Us
  • Data Centre Services
    • Comms Rooms
    • Data Centres
    • Edge Computing
    • Power & Cooling Upgrades
    • UPS Battery Replacement
  • Service & Maintenance
    • UPS Maintenance
    • Cooling Maintenance
    • Generator Maintenance
    • Fire Suppression Maintenance
  • Products
    • UNINTERRUPTIBLE POWER SUPPLIES
    • Small Single Phase UPS
    • Rack Mount UPS
    • Three Phase UPS
    • Modular UPS
    • Central Battery Systems
    • UPS Maintenance Bypass Switches
    • Backup Generators
    • Network & Server Racks
    • RACK POWER DISTRIBUTION (PDU)
    • Data Centre Cooling
    • Netbotz Environmental Monitoring
    • EcostruXure IT Software
    • FIRE SUPPRESSION SYSTEMS
  • Brands
    • APC
    • Riello
    • Eaton
    • Vertiv
    • SDMO
    • Uniflair
  • News
  • Contact Us
Call Us Email Us

Can You Upgrade Data Centre Cooling Without Shutting Down Your Servers?

Upgrading your data centre cooling system can improve energy efficiency, reduce operating costs and protect critical IT infrastructure. However, for businesses that rely on servers being continuously available, the prospect of replacing cooling equipment can raise concerns about downtime.

Which brings us to the question: can you upgrade your data centre cooling without shutting down your servers?

The good news is, yes, it is often possible to upgrade data centre cooling while servers remain operational. With careful planning, sufficient cooling redundancy, temporary cooling arrangements and a phased installation process, businesses can minimise disruption while modernising their infrastructure.

At Source UPS, we specialise in data centre cooling solutions, power infrastructure and equipment upgrades. We help organisations improve efficiency and reliability while prioritising business continuity.

Data Centre Cooling

Why Do Data Centre Cooling Systems Need Upgrading?

Data centre cooling equipment operates continuously to remove heat generated by servers, networking equipment and other IT infrastructure.

Over time, ageing systems can become less efficient, require more frequent repairs and struggle to maintain consistent temperatures.

Common reasons for upgrading include:

  • Increasing maintenance and repair costs.
  • Ageing equipment with limited spare parts availability.
  • Rising energy consumption.
  • Changes in server capacity or rack density.
  • Inconsistent temperatures and recurring hot spots.
  • Cooling systems that are oversized for current IT requirements.

At Source UPS, our power and cooling upgrade services help businesses assess their existing equipment and identify appropriate replacement solutions.

Can Data Centre Cooling Be Replaced While Servers Are Running?

In many cases, yes. However, the feasibility depends on the design of your existing cooling infrastructure.

Facilities with multiple cooling units and sufficient redundancy may be able to maintain acceptable operating temperatures while individual units are replaced.

For example, where a data centre operates several Computer Room Air Conditioning (CRAC) units, it may be possible to take one unit offline while the remaining equipment maintains the required cooling capacity.

However, this approach requires careful assessment.

Removing a cooling unit temporarily reduces available capacity, potentially creating problems if the remaining equipment cannot handle the heat load.

A professional assessment should establish whether the existing system can support a live upgrade safely.

Planning a Phased Cooling System Upgrade

A phased approach is often one of the most effective ways to minimise disruption during data centre cooling upgrades.

Rather than replacing all cooling equipment simultaneously, engineers can plan installations in carefully controlled stages.

Assess Existing Cooling Capacity

Before work begins, the current cooling system should be assessed against the actual IT heat load.

This includes reviewing cooling capacity, equipment condition, airflow distribution and redundancy.

Understanding these requirements helps determine whether the facility can maintain suitable temperatures during replacement.

Develop a Detailed Plan for the Installation

The next stage involves scheduling the work around operational requirements.

Engineers should identify which cooling units can be isolated, where replacement equipment will be installed and how existing cooling will be maintained.

The plan should also account for electrical connections, refrigerant pipework, access restrictions and commissioning requirements.

Monitor Conditions During the Installation Process

Throughout the upgrade, server inlet temperatures and environmental conditions should be monitored.

This allows engineers and facilities managers to identify unexpected temperature changes and respond before they threaten critical equipment.

Appropriate contingency arrangements should also be established before any existing cooling capacity is removed.

How Can Temporary Cooling Prevent Downtime?

Temporary cooling can provide additional capacity when existing equipment must be disconnected.

Depending on the installation, portable air conditioning systems or other temporary cooling equipment may help maintain the required environmental conditions.

However, temporary units must be correctly sized for the heat load and suitable for continuous operation.

They also require appropriate power supplies, heat rejection arrangements and positioning to ensure cooled air reaches the equipment.

At Source UPS, we assess the requirements of each project to identify practical cooling solutions that support operational continuity.

Our data centre cooling range includes perimeter cooling, close-coupled cooling and solutions for smaller server rooms.

The Importance of Cooling Redundancy

Cooling redundancy is particularly important when upgrading equipment in a live data centre.

A redundant cooling system provides additional capacity or standby equipment to help maintain suitable temperatures if another unit becomes unavailable.

For example, an N+1 configuration provides one additional unit beyond the number needed to meet the designed cooling load.

However, having multiple cooling units doesn’t automatically mean an installation has adequate redundancy.

Engineers must consider actual cooling capacity, airflow distribution, power availability and potential single points of failure.

A carefully planned upgrade should preserve sufficient resilience throughout the installation wherever reasonably possible.

Can New Cooling Equipment Reduce Running Costs?

Modern data centre cooling systems can offer improved efficiency compared with older equipment.

For example, close-coupled InRow cooling places cooling equipment closer to the server racks, helping reduce unwanted mixing between hot and cold air.

Hot and cold aisle containment can also improve airflow management and reduce unnecessary cooling demand.

Additionally, businesses that have moved some workloads to cloud-based services may find their existing cooling infrastructure is oversized.

Replacing inefficient equipment with appropriately sized systems can help reduce energy consumption and long-term operating costs.

Maintaining Your Cooling Equipment After Installation

Once your upgrade is complete, regular servicing remains essential.

Preventative maintenance can identify developing faults, maintain airflow and help extend the working life of cooling equipment.

At Source UPS, our cooling maintenance services include nationwide support for different makes and models of data centre air conditioning systems.

Our standard packages include two preventative maintenance visits annually, next-business-day on-site emergency response and 24/7 telephone technical support.

Additional maintenance visits and faster response options are also available, subject to location.

Data Centre Cooling Upgrades With Source UPS

Upgrading data centre cooling doesn’t always require shutting down critical servers, but successful implementation depends on careful preparation and specialist expertise.

At Source UPS, we provide professional power and cooling upgrades for data centres and server rooms throughout the UK.

Our team has experience working in live environments where maintaining operational continuity is essential. In one customer project, we successfully replaced UPS and downflow cooling equipment without interrupting the client’s operations.

Whether your existing cooling equipment is approaching the end of its service life or you’re looking to improve efficiency, we can help you evaluate suitable options.

Planning a data centre cooling upgrade? Contact Source UPS to discuss your requirements and discover how we can help modernise your cooling infrastructure while minimising disruption.

 

Request A Call Back

    our partner brands

    • Uniflair Logo
    • KOHLER-SDMO_Logo
    • Vertiv-Logo
    • Eaton-Logo
    • Riello-Logo
    • apc-logo

    Source UPS

    01252 692559

    Source UPS Ltd, The Hub, Fowler Avenue, Farnborough Business Park, Farnborough, Hampshire, GU14 7JP

    • Glossary
    • FAQs
    • Articles
    • Cookie Policy
    • Privacy Policy

    Website Content © 2026 Source UPS | Website by Brandtastic